Curtis Park-Five Points
District Subarea A
Click on a yellow
project number on the aerial to jump to that project. Click on a thumbnail
to view
the image. Images are numbered 1 -
4 from left to right. Images not credited to another source are original
to DenverInfill.com.
Note: future RTD
transit lines reflect general proposed alignments. Final alignments will
be determined after additional environmental analysis and land
acquisition negotiations.
|
Subarea
A, the northwestern part of the Curtis Park-Five Points district,
contains Curtis Park itself as well as the majority of the district's
significant Victorian-era single-family homes. Larimer Street marks the
transition from residential to commercial and industrial uses and the
boundary with the Ballpark district.
An extension of the Central Corridor light rail line, planned as part of
the FasTracks transit program, will continue along Downing from the
line's current terminus at the 30th & Downing Station to the vicinity of
40th Avenue and 40th Street, where the line will connect with the future
North Metro and Airport commuter rail lines.
Return to the main Curtis
Park-Five Points district map |
|
|
|
|
|
|
|
|
 |
|
|
|
|
|
|
|
 |
 |
1
2999 Lawrence
MAP |
The Village Flats on
Lawrence, also known as 2999 Lawrence, is a condominium project located at the corner
of 30th St. and Lawrence St. The project features 12 units in a
5-story building with parking on the ground floor. The Village Flats
on Lawrence broke ground in November, 2006 and was completed in late 2007. Project website
and Image credits: 1:
www.villageflats.com, 2
(2007-03),
3 (2007-07), 4 (2008-01). Archived photos (2005):
1
2
3 |
 |
 |
|
|
|
 |
 |
2
Villages at Curtis Park (D)
MAP |
The Villages at Curtis
Park is a multi-block redevelopment project undertaken by the Denver
Housing Authority to rebuild several hundred mixed-income housing units
throughout the Curtis Park - Five Points area. The project was
financed as part of the Hope VI federal housing program. Three
blocks were redeveloped between 27th and 30th Streets and between Arapahoe
and Lawrence with a total of 223 units, as Phase I of the project. |
 |
 |
|
|
|
 |
 |
3
Villages at Curtis Park (E)
MAP |
The second block in the
Villages at Curtis Park development, located between 28th and 29th Streets
and Arapahoe and Lawrence. |
 |
 |
|
|
|
 |
 |
4
Villages at Curtis Park (F)
MAP |
The third block in the
Villages at Curtis Park redevelopment project, located between 27th and
28th Streets and Arapahoe and Lawrence. |
 |
 |
|
|
|
 |
 |
5
Broadway Plaza Lofts
MAP |
The Broadway Plaza
Lofts at 2330 Broadway is a 222 unit apartment community completed in
early 2005. The building is 9 stories tall and features 6,000 square
feet of ground-floor retail and 235 spaces of structured parking.
The project was developed by Century Real Estate and was designed by JG
Johnson Architects. |
 |
 |
|
|
|
 |
 |
6
Merchant's Row
MAP |
The Merchant's Row
Brownstones project is located at 910 26th Street at the corner of 26th
and
Champa. The project features 6 units, all 2100 SF or larger.
The project was completed in the Spring of 2006. The Merchant's Row
Brownstones were designed by In Situ Design Architects.
Project website and photo credit 1:
www.merchantsrowbrownstones.com.
Archived photos:
1 |
 |
 |
|
|
|
 |
 |
7
Champa Square
MAP |
Champa Square is a
53-unit apartment building located at 2321 Champa, and is managed as part
of the Park Avenue West Residences development (see # 8 below). The
project was completed in 2003 by Inner City Development. The
4-story building also includes underground parking. |
 |
 |
|
|
|
 |
 |
8
Park Ave West Residences
MAP |
The Park Avenue West
Residences project is located in two buildings at 827 and 837 Park Avenue
West between Champa and Stout streets. The 4-story buildings include
structured parking and were developed by the Burgwyn Company. The
project architect was Josh Comfort/Lawrence Group Architects. The building
at 827 Park Avenue West features 28 units and the building at 837 features
41 units. |
 |
 |
|
|
|
 |
 |
9
VOA Magness Building
MAP |
Completed in late 2000,
the Bob Magness Building at 2660 Larimer Street serves as the
administrative headquarters for the Colorado Chapter of Volunteers for
America. This 3-story building contains 28,000 SF and was designed
by Semple Brown Roberts PC. |
 |
 |
|
|
|
 |
 |
10
Lombard Gate
MAP |
The Lombard Gate project is a 9-unit development at the corner of 24th
and Champa Street, consisting of five townhomes, two carriage homes, and
two penthouse flats. The project designer is Humphries-Poli Architects.
Construction was completed in Winter 2006.
Image credits: 1:
www.curtisparktoday.com. Archived
photos:
1 |
 |
 |
|
|
|
 |
 |
11
Garden Factory Lofts
MAP |
The Garden Factory
Lofts project is a unique 5-unit development. The narrow one-sided
development site allows for each of the five units to be vertically stacked,
with a garage, three living levels, and a rooftop deck. The project
was completed in Fall 2006.
Image credits: 1:
www.bagfactorylofts.com/garden.htm. Archived
photos:
1 |
 |
 |
|
|
|
 |
 |
12
Urbans @
Stout
MAP |
The Urbans @ Stout
project features 5 townhomes located at the corner of 28th and Stout
Street in the heart of the Curtis Park neighborhood. The townhome
units range in size from 2,300 - 2,700 SF. The project developer is
Talus Development (www.talusbuild.com).
The project was completed in June, 2007. Image credits and project website 1:
www.denverurbanlofts.com. Archived
photos:
1
2 |
 |
 |
|
|
|
 |
 |
13
Urbans @ Curtis
MAP |
The Urbans @ Curtis
project, like its sister project above, consists of 5
townhomes with rooftop decks, and is located at 2312 Curtis,
just north of Park Avenue West. The project developer is Talus
Development (www.talusbuild.com)
and the project architect is Bothwell Davis George Architects.
Construction began in May, 2007 and was completed early 2008.
Image credits and project website 1-2:
www.denverurbanlofts.com, 3 (2007-08), 4
(2008-02). Archived
photos:
1 |
 |
 |
|
|
|
 |
 |
14
Upper Larimer (South Site)
MAP |
The Upper
Larimer project consists of two sites across Larimer from each
other, putting it within two different districts. The half of the project in Curtis Park-Five Points consists of
11
townhome live/work units and 20 parking spaces.
The project broke ground on June 20, 2007 and is planned for Spring 2008
completion. See the Ballpark district page for the other project
site.
Image credits and project website 1 -2:
www.upperlarimer.com,
3 (2007-08), 4 (2008-01). Archived photos:
1
2 |
 |
 |
|
|
|
 |
 |
15
Villages at Curtis Park (A)
MAP |
Developed as Phase II
of the Villages at Curtis Park housing project, Blocks A and B together
include a total of 125 units, broken down as follows: 50 units of public
housing, 43 tax credit units, and 32 market rate units. |
 |
 |
|
|
|
 |
 |
16
Villages at Curtis Park (B)
MAP |
Block B of the 2-block
Phase II of the Villages at Curtis Park housing project is located
between Arapahoe and Lawrence Streets and between 31st and 32nd Streets.
Block A (above) is located one block north between 32nd and 33rd
Streets. A small parcel at the eastern corner of Block A remains
undeveloped, with housing planned for that site under Phase IV of the
Villages at Curtis Park project. |
 |
 |
|
|
|
 |
 |
17
Mestizo 31
MAP |
The Mestizo 31 project
is located at the northwest corner of 31st & Arapahoe Streets. The
project will include 10 luxury townhomes with two car garages and private
yards. The project is being developed by Gilmore Construction and
the architect is KUNGarchitecture. The project expects to break
ground in the Summer of 2007. Image credits: 1-3: KUNGarchitecture.
See
DenverInfill Blog 11/15/06. |
 |
 |
|
|
|
 |
 |
18
2428 Champa
MAP |
The 2428 Champa St.
project is located mid block on Champa St. between 24th & 25th Streets.
The project will include a total of 8 units, 4 of which have entrances off
the sidewalk on Champa and 4 accessed by a public plaza in between the
buildings.
The project is being designed by
Bothwell Davis George architects. Construction began in April, 2007.
Image credits: 1-2:
Bothwell Davis George
Architects, 3 (2007-08).
Archived Photos:
1 |
 |
 |
|
|
|
 |
 |
19
Curtis Park Phase IV (A)
MAP |
This empty lot will be
developed as part of Phase IV of the Curtis Park redevelopment by the Denver
Housing Authority. Development on this site will include 48 units in
a mix of single-family and townhome dwellings. See
Project # 24 below for another Phase IV site.
Construction expected to begin in 2008. Image Credits: 1-2:
Denver Housing Authority. |
 |
 |
|
|
|
 |
 |
20
Lawrence Place
MAP |
The empty lot at 2609
Lawrence Street will be
developed by the Volunteers of America into a 15 unit rental apartment
building. The project will be three stories tall and named Lawrence
Place Apartments. Construction timing isn't known yet, but the
project has started development review with the Denver planning
office. See
DenverInfill Blog March 9, 2007. Image Credits: 1:
Volunteers of America. |
 |
 |
|
|
|
 |
 |
21
Luxe Modern Row Homes
MAP |
The Luxe Modern Row
Homes will be located at 25th and Champa on what is now a vacant lot.
The project will consist of 6 row homes each with 4 floors of living
space. Each unit will offer city and mountain views with rooftop
decks. The project is being developed by Arcadia Development, Inc.
Project broke ground in July, 2007. Image Credits: 1: Arcadia
Development, LLC. See
DenverInfill Blog April 22, 2007. Archived Photos:
1 |
 |
 |
|
|
|
 |
 |
22
Cornerstone Residences
MAP |
The Cornerstone
Residences project is a 5-story structure that will serve as
transitional housing for up to 51 homeless individuals or couples. The
developer is the Rocky Mountain Housing Development Corporation in
cooperation with the St. Francis Center located immediately to the north
of the site. The new building will replace an existing smaller structure
in poor condition. Construction is planned to begin in 2008. Image
credit 1:
RMHDC |
Future construction
photo |
Future construction
photo |
|
|
|
 |
 |
23
Trellis
MAP |
The Trellis project
sits mid-block between 25th and 26th on Lawrence and features 11
townhome condominiums in a 4-story building. The project is being
developed by New Communities and the project architect is
in situ Design. Construction
is planned to start early 2008.
Image credits 1-2: in situ Design, 3 (2008-02), 4 (2008-02). |
 |
 |
|
|
|
Project
rendering not
yet available |
 |
24
Curtis Park Phase IV (B)
MAP |
The block bounded by
Park Avenue, 24th, Stout, and California is completely undeveloped
except for an electrical substation which covers about a quarter of the
block. This site will be developed as part of Phase IV of the Curtis
Park redevelopment along with Project # 19 above. This site will include
52 units in a 4-story structure with underground parking. Construction
is planned to begin in 2008. |
Future construction
photo |
Future construction
photo |
|
|
|
 |
 |
25
Urbans @ Lawrence
MAP |
The Urbans @ Lawrence
project is located at the corner of 26th and Lawrence on the site of a
former one-story church. The project will include 5 townhomes designed
by Bothwell Davis George Architects. The project is being developed by
Talus Development, which has constructed many other "Urbans" projects in
the Curtis Park-Five Points district. Construction began early 2008.
Image credits 1-2:
Talus
Development, 3 (2008-02), 4 (2008-02). |
 |
 |
|
|
|
|
|
|