Central Platte Valley
Subarea D
This subarea
includes most of the commercial development planned for the CPV, centered around
the new transit hub behind Union Station, and is envisioned as a mix of
office, hotel, retail, and residential uses. Many of the transit improvements planned for behind Union Station (# 3 on the
map) will be integrated with the commercial projects on the adjacent blocks.
Click on a yellow
project number to go to that project description.
Project Images are numbered 1 -
4 from left to right. Images not otherwise credited are original
to DenverInfill.
The yellow lines are not
intended to reflect real property boundaries but general
project locations only.
Return to main CPV district map
|
 |
|
|
|
 |
 |
1
Millennium Bridge
MAP |
The signature icon for
the Central Platte Valley, the Millennium Bridge is a 130-foot long,
80-foot wide cable-stayed pedestrian bridge that crosses the Consolidated
Main Line (CML) railroad tracks and continues the 16th Street Mall into the
Central Platte Valley. The bridge features a 200-foot tall mast that
tilts backwards and sideways, and with its stark white color and its
nighttime illumination, the $9 million bridge is a new Denver landmark and
a symbol of the city's vitality. |
 |
 |
|
|
|
 |
 |
2
18th Street Bridge
MAP |
The
18th Street Pedestrian Bridge will span the Consolidated Main Line
railroad tracks and connect the Union Station area with the Riverfront
Park area along 18th Street. On the Riverfront Park side, the base
of the bridge will be located between Glass House and the Manhattan. On
the Union Station side, the base will sit between the City House project
and the new light rail station. See
DenverInfill Blog
5/8/2007. Construction to commence in 2008. Image Credits:1-2:
East-West Partners.
|
 |
 |
|
|
|
 |
 |
3
Union Station Development
MAP |
Union Station will
become the multi-modal transit hub for the region where light rail,
commuter rail, and RTD busses converge. These images were taken from the Union Station Master
Plan which was completed in 2004 and is available in full at
www.denverunionstation.org. The master
plan is currently being revised as the project moves toward
implementation. For information on the plan revisions, visit
www.unionstationnow.com,
www.friendsofunionstation.org, or
www.rtd-fastracks.com. |
 |
 |
|
|
|
 |
 |
4
Wewatta Plaza
MAP |
The
Wewatta Plaza project
is proposed for the corner of Wewatta and 18th Street in
the heart of the Union Commons portion of the CPV behind Denver's historic
Union Station. Wewatta
Plaza will feature 180,000 sq feet of for-sale office condominiums, 346
parking spaces on four levels, and approximately 20,000 sq feet of
ground-floor lobby and retail space. See
DenverInfill Blog
2/17/2007. Image Credits and project website:1-2:
www.wewattaplaza.com.
|
 |
 |
|
|
|
 |
 |
5
City House
4
MAP |
The
City House project will sit across from the railroad tracks and the
Manhattan on the block bounded by 18th, 19th, & Chestnut.
Revised plans call
for a 23-story tower with
multiple setbacks holding 393 for sale units.
Construction could commence in 2008. See
DenverInfill Blog 9/10/2006. Image Credits: 1-3:
RiverFront Park. |
 |
 |
|
|
|
Project
rendering not
yet available |
Project
rendering not
yet available |
6
Nichols Mixed-Use
MAP |
The
Nichols Partnership's mixed-use project is envisioned to include a
full-service grocery store (possibly a King Soopers) on the ground floor
and approximately 16,000 square feet of additional retail space, as many
as 200 residential units, and possibly a hotel and/or office space. One
level of parking would be placed underground, with several levels of
structured parking located in the center of the project and wrapped by
the residential and other uses. Construction planned to begin in 2008.
|
Future
construction
photo |
Future
construction
photo |
|
|
|
Project
rendering not
yet available |
Project
rendering not
yet available |
7
Sunshine Mixed-Use
MAP |
Colorado Springs-based Sunshine Development Company's $175 million
mixed-use project is planned to reach 14 stories in height and include
450,000 SF of office space, a 150-room boutique hotel, and
70,000 SF of retail
including two five-star restaurants. Construction is scheduled to being
by the first quarter of 2009. Zimmer Gunsul Frasca Architects of
Portland, OR will design the project in conjunction with the Denver firm
Shear Adkins. |
Future
construction
photo |
Future
construction
photo |
|
|
|
n/a |
n/a |
8
Future development
MAP |
This parcel was once
the site of a proposed W Hotel project by East-West Partners. While that
project fell through, the Commons PUD zoning allows for this site to be
developed with a mix of office, hotel, retail, and residential uses with
a maximum building height of 140 feet (approximately 14 stories). While
East-West Partners is likely to revive this project in the future, no
development proposal for the site is currently active. |
n/a |
n/a |
|
|
|
n/a |
n/a |
9
Future development
MAP |
No development is
currently planned for this parcel, but the Commons PUD zoning stipulates
that development on this site could potentially consist of a mix of
office, hotel, retail, and residential uses. The maximum building height
along the 17th Street half of the block is 140 feet (approximately 14
stories) and potentially 250 feet (approximately 24 stories) along the
18th Street side of the block. |
n/a |
n/a |
|
|
|
n/a |
n/a |
10
Future development
MAP |
This parcel, adjacent
to the Millennium Bridge and the planned FasTracks light rail station,
is designated under the Commons PUD to potentially include a mix of
office, hotel, retail, and residential uses in a structure with a
maximum building height of 140 feet (approximately 14 floors).
Construction of this mixed-use project is likely to occur concurrent
with the development of the planned transit improvements given the
site's constrained location. |
n/a |
n/a |
|
|
|
n/a |
n/a |
11
Future development
MAP |
This development site,
located to the south of the proposed City House project, per the Commons
PUD zoning could include a mix a mix of office, hotel, retail, and
residential uses. Given that the City House project would take advantage
of the block's 250-foot maximum building height allowance, this parcel
is likely to be developed with a maximum building height of 140 feet. |
n/a |
n/a |
|
|
|
n/a |
n/a |
12
Future development
MAP |
Adjacent to the proposed Wewatta Plaza office project, this development
parcel, according to the Commons PUD zoning, could potentially include a
mix of office, hotel, residential, and retail uses in a structure with a
maximum building height of 140 feet. |
n/a |
n/a |
|
|
|
n/a |
n/a |
13
Future development
MAP |
This site includes a small existing industrial building and undeveloped
land. The Commons PUD zoning allows for a mix of office, hotel,
residential, and retail uses in structures with a maximum building
height of 140 feet on the undeveloped portion. A rezoning of the portion
of this site with the existing structure to RMU-30 has been proposed
that would allow for the site to be developed as a single zone lot.
|
n/a |
n/a |
|
|
|
|
|
|