Sunday, July 22, 2007
DenverInfill Update: Lower Downtown Construction Photos
This post is the first of a district-by-district Summer 2007 construction photo update for many of the new urban infill projects being built in the greater Downtown Denver area.
Let's kick things off with Lower Downtown:
1400 Wewatta on Block 012 (9 and 10 stories, mixed-use office/residential with ground-floor retail):

1515 Wynkoop on Block 013 (8 stories, office with ground-floor retail):

Sugar3 on Block 019 (10 stories, mixed-use office/residential with ground-floor retail):

Downtown Denver: Rebuilding the Core
Let's kick things off with Lower Downtown:
1400 Wewatta on Block 012 (9 and 10 stories, mixed-use office/residential with ground-floor retail):

1515 Wynkoop on Block 013 (8 stories, office with ground-floor retail):

Sugar3 on Block 019 (10 stories, mixed-use office/residential with ground-floor retail):

Downtown Denver: Rebuilding the Core
Comments:
Links to this post:
<< Home
Those three LoDo projects all seem great. Any new news on when 1755 Blake or 1800 Market are going to get underway?
Post a Comment
Links to this post:
<< Home



