Block 131
Click on a blue arrow
on the aerial to go to the adjacent block or district.
Click on the Block
Locator image to return to the main district map.
Street elevation photos were taken in
2004/2005. |
Block
Address Ranges:
1400 (Even):
Champa Street
800
(Even): 15th Street
1400
(Odd): Stout Street
800
(Odd): 14th Street
Parking
Lots /
Vacant:
0% (after infill)
|
Block
Locator:
 |
Champa
Street: |
 |
15th
Street: |
 |
|
| |
Spire
|
 |
On the
parcel at 14th and Champa:
Name:
Spire
Type:
For-sale
Residential
Number
of Units: 502
Cost:
$160 million
Description: A 41-story condominium project developed by the Nichols
Partnership at the site currently occupied by a surface parking lot and the
Davis & Shaw Furniture Building (still visible in the 2005 Champa Street
elevation photo above), which was razed in November 2005 to
make way for the new
tower.
Architect:
RNL Design
Current
status: Construction began in late April, 2007, with completion
scheduled for 2009.
Project
website:
www.spiredenver.com |
On the
parcel at 15th and Stout
Name:
Hotel Gold Crown
Type:
Mixed Use
Description: A 17-story tower featuring two levels of underground
parking, ground floor lobby and retail functions, 264 hotel rooms on the
next 12 floors, and 12 condominium units on the top three floors.
Cost:
Unknown
Developer:
Ranko
Mocevic
Architect:
OZ Architects LoDo
Current
Status: In review with the city. Construction potentially to begin in
2009. The existing small restaurant building on the site will be demolished.
The parcel at 14th and Stout was once the site of a proposed "seniors"
condominium tower by St. Charles Town Company. St. Charles purchased the
site in March 2005 with the intent of constructing a 30-story age-restricted
tower for those over 55 years of age. After almost two years of owning the
land, SCTC sold the parcel to Focus Property Group in January 2007.
|
Spire
(2007-06) |
 |
|